Workbook · 25-page PDF · Premium
Kitchen Remodel Planning: Budget, Order of Work and Layout That Works
Kitchen remodel planning made concrete: realistic budget split, the correct order of trades, countertop height formula and a contractor comparison sheet. See inside.

The full workbook, ready to print
- ✓Budget worksheet using the 35/20/15/10 allocation model with contingency line
- ✓Immovable services map for plumbing, gas and duct runs before you design
- ✓Countertop height calculator for multiple cooks and split-height runs
- ✓14-stage order of work, trade by trade, with realistic durations
- ✓Week-by-week project timeline grid you fill in yourself
- ✓Contractor and supplier comparison sheet with markup-killing questions
- ✓Master checklist from first sketch to snag list sign-off
Hosted on FileJoker. Premium members download instantly; free download has a wait.
In a hurry? Free one-page checklist32 items to tick off · print-ready PDF, no sign-upDownload freeIncluded bonuses — free with the guide
1 extra guide from the same topicA look inside the PDF
9 sections · 25 pages


Full table of contents
- Why Most Kitchen Remodels Go Wrong Before Demo Day
- Worksheet 1: Build Your Budget With the 35/20/15/10 Allocation Model
- Worksheet 2: Layout, Countertop Height and the Immovable Services Map
- The Correct Order of Work: 14 Stages, Trade by Trade
- Worksheet 3: Week-by-Week Project Timeline You Fill In
- Worksheet 4: Contractor & Supplier Comparison Sheet (and How to Kill the Markup)
- Cooking Core: Induction vs Gas, and Getting the Hood Right
- Nine Expensive Mistakes and How to Catch Them Early
- Master Checklist: From First Sketch to Snag List Sign-Off
In this article
“I have no idea what this should actually cost, and no one will give me an honest price.” If that’s where your kitchen remodel planning starts, you’re in good company — most homeowners are also unsure which trade comes first, why the stove ends up with no landing space, and whether the 36-inch countertop is right for their height.
This page gives you the short answers: how to allocate your budget, the correct order of work, the 3×4 kitchen rule in plain English, and how induction, gas and hood placement affect real cooking.
The premium PDF turns those answers into a working file: a budget allocation worksheet, an immovable services map, a 14-stage order of work, a week-by-week timeline and a contractor comparison sheet built to strip out markup.
The short answer
Plan a kitchen remodel in this order:
- Set the budget first — allocate roughly 35% cabinetry, 20% labour, 15% appliances, 10% countertops, with 10–15% contingency held back.
- Map immovable services — existing drain, gas and duct runs decide your layout cheaply.
- Design the work triangle using the 3×4 rule: three zones (cook, clean, store) and four core points kept within easy reach.
- Lock specs and quotes before demo — price appliances independently of cabinet suppliers.
- Sequence the trades: demo, rough electrical and plumbing, insulation, drywall, flooring, cabinets, countertop template, tiling, appliances, snag list.
Why Most Kitchen Remodels Go Wrong Before Demo Day
Most kitchen projects fail in the planning weeks, not on site. Three things go wrong before anyone swings a hammer.
- Money allocated by feel. You pick cabinets you love, then discover the electrical upgrade eats the countertop budget. A split decided up front stops that.
- Trades booked out of order. Countertop templating before cabinets are set. Flooring before drywall. Each mistake costs a return visit and a week of waiting.
- Layout drawn without the cook in mind. The 3D planner doesn’t know you’re 5’3”, left-handed, or that the waste stack can’t move.
The free 3D planner problem
Retailer planners are good at one job: arranging boxes and generating a cabinet order. They don’t schedule your electrician, price your permit, calculate a contingency, or tell you that your 34.5” base cabinets will hurt your back. This workbook sits on top of that plan and builds the project around it.
Renovation, remodel, refresh
Readers ask this constantly, and it matters because each word points to a different permit, budget and timeline.
| Term | What changes | Permit likely? |
|---|---|---|
| Refresh | Doors, hardware, paint, countertops, appliances swapped like-for-like | Usually no |
| Remodel | New layout of cabinets and appliances; plumbing and electrical moved within the room | Usually yes |
| Renovation | Walls, ceilings, windows, structure; services rerouted or upgraded | Yes, plus possible inspections |
The key line is whether services or structure move. Check your local building department for current rules.
The order everything happens in
| Stage | What you decide | Worksheet |
|---|---|---|
| 1. Scope | Refresh, remodel or renovation | W1 (scope page) |
| 2. Budget | 35/20/15/10 allocation + contingency | W1 |
| 3. Layout | Work zones, counter height, immovable services | W2 |
| 4. Bids | Compare contractors and suppliers like-for-like | W4 |
| 5. Schedule | 14 stages mapped to real dates | W3 + Section 5 |
| 6. Build | Track progress, snag, sign off | W3 (mark off each stage) |
How to use the worksheets
Fill in Worksheets 1 and 2 now, before you call anyone. You need a number and a layout to have a useful conversation.
Leave the cost columns in Worksheet 4 and the dates in Worksheet 3 blank until after your first contractor visit. Fill them in during or immediately after the meeting, not from memory.
Tip: Print Worksheets 1, 2 and 4. Take them to every contractor meeting. Contractors price a defined scope more accurately, and more cheaply, than a vague one.
The Short Answers: Budget, Order of Work and the 3×4 Kitchen Rule
What’s a realistic budget?
Price your kitchen against your home’s value, not against a magazine figure that ages out in a year.
| Band | % of home value | What it usually buys |
|---|---|---|
| Light | 5–8% | Same layout, same plumbing. New cabinets or refaced boxes, counters, paint, flooring, appliances. |
| Mid | 8–12% | Minor layout changes, some new electrical circuits, moved sink or range within a few feet, better materials. |
| Full | 12–15% | Walls moved, services relocated, new windows, custom cabinetry, high-end appliances. |
On a $450,000 home, that’s roughly $22,000 at the low end and $67,000 at the top. Going far past 15% rarely comes back at resale. Under 5% means you’re refreshing, not remodeling.
Whatever band you pick, hold back a contingency inside it — not on top of it. Worksheet 1 walks through the 35/20/15/10 allocation and where the contingency sits.
The correct order of work
Design → permits → demo → rough plumbing, electrical, HVAC → inspection → drywall → paint (first coats) → flooring → cabinets → countertop template → countertop install → backsplash → appliances → punch list.
| # | Stage | Typical duration |
|---|---|---|
| 1 | Design and final drawings | 2–6 weeks |
| 2 | Permits and approvals | 1–4 weeks |
| 3 | Order cabinets and long-lead items | order now, 4–12 weeks lead |
| 4 | Demo and haul-out | 2–4 days |
| 5 | Framing and structural changes | 2–5 days |
| 6 | Rough plumbing, electrical, HVAC | 3–7 days |
| 7 | Rough inspection | 1–3 days (scheduling) |
| 8 | Insulation and drywall | 4–7 days |
| 9 | Prime and first coats of paint | 2–3 days |
| 10 | Flooring | 2–4 days |
| 11 | Cabinet install | 3–6 days |
| 12 | Countertop template → fabrication → install | 1 day, then 7–14 days, then 1 day |
| 13 | Backsplash, final plumbing, appliances, final paint | 3–6 days |
| 14 | Final inspection and punch list | 1–2 weeks |
That gap at stage 12 is the one that surprises people. Templating can’t happen until the cabinets are installed and level, because the fabricator measures the real boxes, not your drawings. Then you wait 1–2 weeks with no counters, no sink, and no dishwasher. Plan meals around it.
The 3×4 kitchen rule
Three zones: store (fridge, pantry), prep (sink, main counter run), cook (range, hood). Four working areas that must exist as real, clear counter: landing space beside the fridge, prep space beside the sink, landing space beside the cooktop, and a set-down spot near the oven or microwave.
Test your plan by walking it on paper. Put a finger on each zone in turn. If any of the four areas is under 15 inches of clear counter, your plan fails — and the range in an alcove with 6 inches on each side is the most common failure of all. Something else has to give, because every kitchen is a set of trade-offs.
Warning: Countertop first, backsplash second. Always. Tile that’s laid down onto the counter locks the two together — you can’t replace the counter later without smashing the tile. Set the counter, then tile up to it and caulk the joint.
Cooking Core: Induction vs Gas, and Getting the Hood Right
Hob types, compared straight
| Induction | Gas | Radiant electric | |
|---|---|---|---|
| Responsiveness | Very fast. Hard boil to simmer in seconds | Very fast, visible flame feedback | Slow. Element holds heat after you turn it down |
| Install cost | Dedicated 240V circuit, usually 40–50A breaker — check your hob’s plate | Gas line plus electric ignition outlet | Same 240V circuit as induction |
| Cookware | Magnetic only. Test with a fridge magnet | Anything | Anything flat |
| Cleaning | Wipe a flat cold surface | Grates, caps, burner heads off | Flat, but spills bake on |
| Ventilation load | Steam and grease only | Steam, grease, plus combustion byproducts | Steam and grease |
Arguments about which is “more responsive” miss the point. Induction changes power instantly; gas changes flame instantly but the pan lags either way. Pick on the rest of the row: if you wok-cook over flame or lose power often, gas wins. If you simmer, sear, and hate scrubbing, induction wins.
Warning: Price the electrical work before you fall for a hob. A dedicated 240V run from a panel two rooms away, plus a panel upgrade if you’re full, can add four figures. Get your electrician to quote it during the bid stage, not after the hob is on order.
Sizing and mounting the hood
- Match or exceed hob width. A 30-inch hob wants a 30-inch hood minimum; 36 inches captures far better.
- Mount 24–30 inches above the cooking surface for a wall hood. Higher looks good and captures badly.
- Check the manufacturer’s spec for your model — those ranges vary.
- Airflow ratings are lab numbers on short straight duct. Every elbow and every extra foot of run cuts real delivery. Short, straight, rigid metal duct beats a high CFM number through flex pipe and three turns.
The back-burner thing. Most hood capture areas — baffles, filters, canopy depth — sit toward the back. Front burners steam out past the edge. Put your stockpot, your steaming pasta, and your hard sear on the back burners. Use the fronts for low simmering and holding.
Ducted vs recirculating
Ducted out is always better. Aim for the shortest route to an exterior wall or roof. If your hob sits on an interior island with no clean path, either move the hob or accept a recirculating hood with carbon filters — it handles grease and odor, not moisture or heat. Replace those filters on schedule or it does nothing.
High-CFM hoods can pull enough air to need make-up air. Ask your contractor whether your local code requires it at your CFM.
Decision grid
| How you cook | Venting route | Hob | Hood airflow | Duct |
|---|---|---|---|---|
| Light: reheat, pasta, occasional sear | Interior island, no run | Induction | 300–400 CFM | Recirculating, carbon filters |
| Everyday family cooking | Exterior wall within 8 ft | Induction or gas | 400–600 CFM | 6-inch rigid, ≤2 elbows |
| Heavy: frying, searing, wok | Exterior wall or roof, short run | Gas or induction | 600+ CFM | 8-inch rigid, straight, check make-up air rule |
| Fixtures can’t move more than a few inches | Existing duct stub only | Match existing fuel | Whatever the existing duct carries | Reuse stub, upsize hood width instead |
Nine Expensive Mistakes and How to Catch Them Early
1. Tiling the backsplash down onto the countertop
Tile that laps over the counter edge glues the two together. When the counter chips or you want to change it, the tile breaks with it. Tile to the underside of the last course instead, and close the gap with a flexible caulk joint in a color matched to the counter.
Cross-section sketch (draw this on your plan and hand it to the tile setter):
| Wall side | Joint at counter | Result later | |
|---|---|---|---|
| Wrong | Tile runs down past the counter’s back edge, mortar bedded on the stone | Grout, rigid | Counter can’t be lifted out; tile must be smashed |
| Right | Bottom tile stops 1/8 in above the counter surface, wall-supported only | Silicone caulk, flexible | Cut the caulk, slide the counter out, re-caulk |
Tip: Write “tile to underside, caulk joint, no tile bedded on stone” into the scope sheet. It costs nothing and it’s the single most common irreversible error.
2. Treating the cabinet order as final before anyone checks the walls
You have to order cabinets early — lead time is the critical path, and every trade behind you waits on that delivery. So place the order on locked drawings. Just don’t treat the field measure as settled at that point.
Split it into two steps:
- Order on locked drawings at the date your backward timeline gives you. Sizes, finishes, door styles, hardware — all fixed.
- Confirm the field measure after framing and rough-in, once walls are straight, blocking is in and the plumber and electrician are done moving things.
Then negotiate the gap between those two steps. Ask your supplier, in writing, for a no-cost measurement-adjustment window: a stated number of days after order in which you can revise cabinet widths, filler sizes and panel dimensions without a restocking fee or a new lead time. Get the cutoff date and put it in your timeline grid next to the rough-in inspection week.
A wall that moved 3/4 in is a five-minute email inside that window. Outside it, the same 3/4 in turns a $9,000 order into a filler-strip rescue job.
Tip: Ask two questions before you sign: “What’s the last date I can adjust dimensions at no cost?” and “What does a change after that date cost in dollars and weeks?” If the supplier won’t answer either one, price a second supplier.
3. Taking 36 in counter height on faith
Stand straight, arms loose. Measure floor to wrist bone for every person who cooks. If you’re 5 ft 2 in, your number may land near 33–34 in; a 6 ft 2 in cook may want 38 in. You don’t need ADA cabinets — you adjust toe-kick height or cabinet box height at order time. If two cooks disagree, split the difference on the main run and set one prep zone (island or baking spot) to the shorter person’s number.
4. A stove in an alcove with no landing space
Give the range at least 12 in of counter on one side and 15 in on the other. Hot pans need somewhere to go. Check it on the plan with a real 12 in skillet drawn to scale.
5. A fridge door that swings into the walkway
Draw the door arc at full open, plus the drawer pull-out. If it blocks the only path between sink and stove, flip the hinge side or move the fridge before you order.
6. Flooring stopped at the cabinet line
Decide out loud: floor under everything, or floor only in the open area? If you stop at the cabinet toe-kick, you can never slide the dishwasher or range out without a ramp of shims. Run flooring under all appliance bays at minimum.
7. Spending the contingency in week two
Your 10% contingency is for what’s behind the wall, not for upgraded pulls. Lock it in a separate line and require a written surprise — rot, old wiring, a cracked drain — before it releases.
8. Buying a trend instead of a wear rating
Warm woods, mixed metals, and quieter stone are reading current. What dates fastest: very high-gloss slab fronts, all-white-everything, and open shelving over the cooking zone. Pick hardware and paint for trend; pick counters, floors and cabinet boxes for 15 years of wear.
9. Designing around fixtures you can’t afford to move
If the drain stack can only move a few inches, design to that limit early. Confirm the plumber’s real number for relocating the sink before the layout is final — not after cabinets ship.
Frequently Asked Questions
In what order should a kitchen remodel be done?
Rough work first, finishes last. The condensed version of the 14-stage order:
- Permits, final drawings, cabinet order placed
- Demo and haul-off
- Structural work (walls, headers, windows)
- Rough-in in this order: plumbing and gas first, then ducting and hood venting, then electrical last
- Rough inspection
- Insulation, drywall, tape, prime
- Flooring (or after cabinets, if it’s a floating floor)
- Cabinet install, then countertop template
- Countertop fabrication and install (7–14 days after template)
- Final plumbing, final electrical, appliance hookup
- Backsplash, paint, trim, hardware
- Final inspection and punch list
Plumbing and gas go first because the pipes are biggest and least flexible. Ducting works around them. Wire bends around everything, so electrical goes last.
Warning: Never let the countertop fabricator template off drawings. Template happens on installed, leveled cabinets. Every other sequence error costs you once; this one costs you a whole slab.
What is a realistic budget for a kitchen remodel?
Price against your home’s value, using the same band table from the budget section:
| Band | % of home value |
|---|---|
| Light | 5–8% |
| Mid | 8–12% |
| Full | 12–15% |
Going far past 15% rarely comes back at resale. Check current local labor and material figures before you lock anything in.
Then split the total with the 35/20/15/10 model. These are allocation shares of the build cost:
| Line | Share |
|---|---|
| Cabinetry & installation | 35% |
| Labor (GC, trades, demo) | 20% |
| Appliances | 15% |
| Countertops | 10% |
| Flooring, lighting, plumbing fixtures | 10% |
| Subtotal | 90% |
| Contingency | 10–20% |
Your contingency sits inside the total you will not exceed, not on top of it. That’s why the line items stop at 90%. Use 10% if nothing moves, 15% for a full remodel inside the existing footprint, and 20% if walls come down, plumbing or gas moves, or the house was built before 1980.
Permits, dumpster rental and your temporary kitchen belong inside the 90% too. Leave them out and they eat the contingency in week one.
What is the 3×4 kitchen rule?
Three zones and four landing areas.
The three zones:
- Store — fridge and pantry
- Prep — sink and the main counter run
- Cook — range and hood
The four landing areas have to exist as real, clear counter — somewhere you can set a hot pan or a full grocery bag:
- Beside the fridge — at least 15 inches
- Beside the sink, for prep
- Beside the cooktop — 12–15 inches on each side
- A set-down spot near the oven
Aisle clearances are a separate check: at least 42 inches for one cook, 48 inches if two people work at once or the aisle has cabinets on both sides. Worksheet 2 walks you through testing all of it against your existing drain and gas lines.
What is the new look for kitchens in 2026?
Warmer and less white. Wood-grain fronts, muted greens and clay tones, stone-look quartz with visible movement, unlacquered brass and matte black mixed in the same room, integrated panel-front fridges and dishwashers, and more closed storage than open shelving. Slim-profile induction and ceiling-flush hoods are showing up more often.
Pick trends for the cheap layer only — paint, hardware, lighting. Cabinet boxes and layout should be decided on function, because you’re living with them for 15 years.
Is ‘renovation’ different from ‘remodeling’ — and does it change my permit?
Casually, yes. Renovation usually means updating what’s there. Remodeling usually means changing the layout or structure.
Your building department doesn’t care which word you use. Permits key off the work itself: moving or adding plumbing, gas, or electrical circuits, taking out a wall, changing a window opening. Like-for-like swaps often don’t need one. Call your local department and describe the work, not the label.
Can I supply my own appliances if the contractor installs them?
Usually yes, and it’s often the best money you’ll save. Ask for install labor priced separately, in writing, before you sign.
Tip: Scratch-and-dent is real money. A dented fridge side that faces a cabinet panel is invisible once installed. Confirm who warranties the install if you bought the unit elsewhere — that’s the one clause to pin down.
- ✓Budget worksheet using the 35/20/15/10 allocation model with contingency line
- ✓Immovable services map for plumbing, gas and duct runs before you design
- ✓Countertop height calculator for multiple cooks and split-height runs
- ✓14-stage order of work, trade by trade, with realistic durations
- ✓Week-by-week project timeline grid you fill in yourself
- ✓Contractor and supplier comparison sheet with markup-killing questions
- ✓Master checklist from first sketch to snag list sign-off
Frequently asked questions
In what order should a kitchen remodel be done?
Design and final sign-off come first, then demolition, structural changes, rough-in electrical and plumbing, HVAC and ducting, inspection, insulation, drywall and paint, flooring, cabinet installation, countertop templating and fitting (usually a 1–2 week gap), backsplash, plumbing and electrical trim-out, appliance install, and finally a snag list walkthrough. Skipping the rough-in inspection or templating countertops before cabinets are level is where budgets blow up.
What is a realistic budget for a kitchen remodel?
A realistic mid-range remodel usually lands at 5–10% of your home's value; luxury runs higher. Rather than chasing one number, allocate: about 35% cabinetry, 20% labour, 15% appliances, 10% countertops, the rest split between flooring, lighting, plumbing and finishes — then ring-fence 10–15% contingency for hidden wiring, rot or out-of-level walls. If contingency isn't separate, it will be spent.
What is the 3x4 kitchen rule?
It's a quick layout sanity check: your kitchen should serve three core zones — cooking, cleaning and storage — and keep four key points (hob, sink, fridge and prep counter) close enough that you move between them without crossing traffic. Practically, it means at least 12–15 inches of landing space beside the hob and fridge, and an uninterrupted prep run next to the sink.
How do I stop contractors marking up appliances and cabinets?
Price the big three separately: get the cabinet quote itemised by box, door, hardware and installation, then source appliances yourself from a retailer and ask the fitter for labour-only. Request at least three written quotes on the same specification sheet so you're comparing identical items, and ask directly what discount is being passed on from trade pricing. Markup hides in bundled "supply and fit" lines.
How do I choose the right countertop height for my height?
The 36-inch standard suits someone around 5'6". A workable formula: measure from the floor to your bent elbow, then subtract about 4–6 inches for general prep, more for chopping and kneading. Taller cooks often prefer 38 inches; shorter cooks 32–34. You can also split heights — a lower baking section and a standard main run — since cabinets are built to order anyway.
We collected 50 real questions and comments about "kitchen remodel planning" (42 from YouTube comments, 4 from People Also Ask, 4 from search suggestions), grouped them into 13 recurring problems, and built this guide to resolve the 7 that block people most. The top-ranking pages were reviewed for gaps; 7 of those gaps became dedicated sections.
Edited by Alex Hirn · Last updated September 28, 2026 · How we make our guides
More in Home & Organizing
free
premium+1 bonus
premium+1 bonus
premium+1 bonus